Town Centre Regeneration

Town Centre Regeneration 2017 update

I have been out walking around Weston-super-Mare, Town Square again today and the work is well and truly underway now – remember this project is on a tight timescale; then again, aren’t they all!

Scrub has been removed and ground cleared with bricks being recovered from the pathways. Just the one recycling tipper lorry onsite, though the driver had made two trips and returned in the time I was at the site.

It may seem a shame to some people though I believe it will be a modern and fresh revamp for W-s-M, linking to the seafront, with commonality of style and materials, whilst retaining what can be utilised from the past.